Menu

Healthcare

The consistent care of medical patients requires proper and timely maintenance of vital electrical systems and regulators. Neal Electric engineers and staff are trained to efficiently perform necessary tasks in healthcare environments without significantly disrupting patients, staff or daily operations. We are OSHA-compliant and sensitive to mandatory safety policies of medical environments.

Edgemoor Skilled Nursing Facility | Santee, California

Size: 180,300 SF
General Contractor: Sundt Construction, Inc.

The project is a 192 bed Skilled Nursing Facility built on 12.55 acres.

Kaiser Permanente Carmel Valley | San Diego, California

Size: 50,000 SF
General Contractor: DPR Construction
Owner: Kaiser Permanente

The project includes a 2-story medical office building will feature primary care, pediatrics, obstetrics and gynecology, radiology, laboratory, pharmacy, a women’s center, after-hours care and other specialty services.

Sidney Kimmel Cancer Center | La Jolla, California

Size: 90,000 SF
General Contractor Rudolph & Sletten
Owner:
 Sidney Kimmel Cancer Center

The building is a 90,000 SF research facility consisting of approximately 60,456 SF of laboratory, office, and auditorium space, a 10,622 SF of subterranean vivarium space and a 37-stall subterranean parking garage.

Testimonials

Tom Whaley

MEP Coordinator | Sundt Construction, Inc

“During the past 2 years it has been the dedication of all Neal’s employees involved to create 3-D, fully coordinated construction drawings. Neal Electric always included their field Superintendent in design issues insuring knowledge of design intent. This has resulted in proper sequencing of work with adequate manpower for completion on or before scheduled dates. I appreciate the cooperation and professional attitude Neal Electric has displayed on this very difficult project and would recommend them for any project they are proposing.”

Don Chandler

Senior Mechanical Coordinator | Rudolph and Sletten, Inc.

“I have no reservations over having selected Neal Electric for this project and have high hopes our next project to bid will have this same team in place to perform as flawlessly as they have on our Pomerado Hospital New Patient Tower. Working with Neal has been a pleasure throughout the course of the Pre-Construction Phase.”