Menu

Medical & Health Care

The consistent care of medical patients requires proper and timely maintenance of vital electrical systems and regulators. Neal Electric engineers and staff are trained to efficiently perform necessary tasks in healthcare environments without significantly disrupting patients, staff or daily operations. We are OSHA-compliant and sensitive to mandatory safety policies of medical environments.

>> Download our Medical PDF

 

Edgemoor Skilled Nursing Facility | Santee, California


Size: 180,300 SF
Contractor/Operator: Sundt Construction, Inc.
Architect/Engineer: Carrier Johnson

This new two-story, 192 bed Distinct Part Skilled Nursing Facility is built on 12.55 acres of undeveloped land including a new street and right of way improvements.

Kaiser Permanente Carmel Valley | San Diego, California

Size: 50,000 SF
Contractor/Operator: DPR Construction
Owner: Kaiser Permanente
Architect/Engineer: Architects Hanna Gabriel Wells

This new 2 story medical office building will feature primary care, pediatrics, obstetrics and gynecology, radiology, laboratory, pharmacy, a women’s center, after-hours care and other specialty services. Energy efficient lighting was designed in compliance with Title 24 requirements. Automatic lighting control systems were designed including motion sensors and lighting control panels.

Sidney Kimmel Cancer Center | La Jolla, California

Size: 90,000 SF
Contractor: Rudolph & Sletten
Owner:
 Sidney Kimmel Cancer Center
Architect: Delawie Architecture

The building is a 90,000 SF research facility consisting of approximately 60,456 SF of laboratory, office, and auditorium space, a 10,622 SF of subterranean vivarium space and a 37-stall subterranean parking garage.

Testimonials

Tom Whaley

MEP Coordinator | Sundt Construction, Inc

“During the past 2 years it has been the dedication of all Neal’s employees involved to create 3-D, fully coordinated construction drawings. Neal Electric always included their field Superintendent in design issues insuring knowledge of design intent. This has resulted in proper sequencing of work with adequate manpower for completion on or before scheduled dates. I appreciate the cooperation and professional attitude Neal Electric has displayed on this very difficult project and would recommend them for any project they are proposing.”

Don Chandler

Senior Mechanical Coordinator | Rudolph and Sletten, Inc.

“I have no reservations over having selected Neal Electric for this project and have high hopes our next project to bid will have this same team in place to perform as flawlessly as they have on our Pomerado Hospital New Patient Tower. Working with Neal has been a pleasure throughout the course of the Pre-Construction Phase.”